The MorainePlanning & Conservation Advisory

Tool 2 · O. Reg. 140/02, s. 30

Section 30 Landform Conservation Area Calculator

Test a proposed site plan against the Oak Ridges Moraine landform caps. Every impervious surface counts toward both the impervious and the total disturbance limit; septic beds and grading count toward disturbance.

Landform Conservation Area
Units
Site

Net developable area excludes key natural heritage and hydrologic features and their minimum vegetation protection zones. Percentages are measured against the total site area; the plan must also fit inside the net developable area.

Proposed impervious surfaces

Count toward both the impervious and the disturbed limits.

Other disturbed area

Counts toward the disturbed limit only.

Section 30 Landform Summary

Enter the site and proposed areas.

Continue to Site Screening Request

Preliminary check against O. Reg. 140/02 s. 30 — final areas come from an Ontario Land Surveyor's topographic survey and the approved site plan. Method.

What Section 30 limits

In Landform Conservation Areas, applications for development or site alteration must keep disturbance and impervious cover within fixed shares of the site: no more than 25% disturbed and 15% impervious in Category 1, and no more than 50% disturbed and 20% impervious in Category 2, while conserving the landform character (kames, kettles, ridges and steep slopes) and minimising grading.

Read the landform conservation guide →

Ways to recover allowance

  • Shorten and narrow the driveway alignment; site the house nearer the road.
  • Use permeable interlocking pavers or open-graded surfaces where the municipality accepts them, with infiltration trenches for roof runoff.
  • Tighten the grading limit and fence it during construction; avoid lawn clearing beyond the building envelope.
  • Combine accessory buildings; place the septic bed on already disturbed or flatter ground.

Before you buy, design or apply

Know what the Moraine will ask of your property

A pre-consultation site screening sets out the ORMCP designation, the Conservation Authority permit tier, the technical studies the municipality will require and a realistic soft-cost budget and timeline.