The MorainePlanning & Conservation Advisory

Sources · Assumptions · Updates

Regulatory Sources & Cost Methodology

Where every figure comes from, the exact rules behind the Screening Tool and Landform Calculator, and what the results can and cannot tell you.

Topographic map with a compass and pencil used for site planning

Every figure on The Moraine traces back to a published regulation, a Conservation Authority fee schedule, a municipal user-fee by-law, or a stated range from Southern Ontario consulting practice. This page lists those sources, shows the exact rules behind both tools, and explains what the numbers can and cannot tell you.

Regulatory sources

  • Oak Ridges Moraine Conservation Plan, O. Reg. 140/02, as amended by O. Reg. 141/17 — designations (Part II), key natural heritage and hydrologic features (ss. 22, 23, 26), water resources (ss. 24, 27, 29), Landform Conservation Areas (s. 30), lot creation (s. 32), and the November 15, 2001 transition rules (ss. 6, 7).
  • Oak Ridges Moraine Conservation Act, 2001 — the enabling statute and the conformity requirement for Official Plans and zoning by-laws.
  • Conservation Authorities Act, ss. 28 and 28.1, and O. Reg. 41/24 (Prohibited Activities, Exemptions and Permits) — permit triggers, the s. 7 completeness requirement, the 21-day completeness notice and the 30-day / 90-day review targets.
  • Municipal user-fee by-laws — including the Town of Caledon Consolidated Fees By-law (scoped ORM site plan pre-consultation about $325 + HST; complex streams $2,100–$8,600+), and the planning fee schedules of King, Uxbridge and Whitchurch-Stouffville.

Conservation Authority fee schedules

The 2026 permit fee comparison and the screening tool's fee lookup draw on the following published schedules:

  • Toronto and Region Conservation Authority (TRCA) — Fee schedule effective Feb 1, 2026.
  • Lake Simcoe Region Conservation Authority (LSRCA) — Fee schedule effective Apr 1, 2026.
  • Credit Valley Conservation (CVC) — 2026 consolidated fee schedule.
  • Central Lake Ontario Conservation Authority (CLOCA) — Current O. Reg. 41/24 schedule.
  • Ganaraska Region Conservation Authority (GRCA) — Current O. Reg. 41/24 schedule.
  • Nottawasaga Valley Conservation Authority (NVCA) — 2026 schedule (+3% cost-of-living adjustment).
  • Kawartha Conservation (Kawartha) — Current O. Reg. 41/24 schedule (Schedules 1 & 2).
  • Lower Trent Conservation (Lower Trent) — Current O. Reg. 41/24 schedule.
  • Otonabee Conservation (Otonabee) — Current O. Reg. 41/24 schedule.

Where an authority publishes a range, a percentage adjustment, or confirms fees only after a pre-consultation inquiry, we show it that way rather than inventing a single number.

Consulting fee benchmarks

Soft-cost ranges for planning, ecology, hydrogeology, landform and arborist work are typical Southern Ontario market ranges for Moraine files: land-use planning (RPP/MCIP) $8,000–$45,000+ across scopes; Natural Heritage Evaluation $15,000–$40,000+; hydrogeological assessment and water balance $10,000–$35,000+; landform conservation plan and civil grading $8,000–$25,000+; arborist report and tree protection plan $2,500–$8,500. Actual quotes depend on site size, survey season, the number of features, drilling needs and the municipality's terms of reference.

How the screening tool works

The ORMCP Permit, Study & Budget Estimator is deterministic: the same inputs always give the same result. It takes six inputs — project type, ORMCP designation, lot-of-record status on November 15, 2001, Landform Conservation Area category, distance to key features, and Conservation Authority — and applies these rules:

How the screening tool reaches each part of its result
OutputRule applied
Restricted pathwaySeverance in Natural Core or Linkage; new custom home in Core or Linkage on a lot not of record on Nov 15, 2001; secondary suite/ARU in Core or Linkage; commercial or institutional development in Core or Linkage; any development within the 30 m MVPZ.
Conditional pathwayCustom home on a pre-2001 lot of record in Core, Linkage or Countryside (s. 7); addition or accessory building to a lawfully existing dwelling (s. 6(2)); severance in Countryside (s. 32 exceptions only); ARUs in Countryside; uncertain lot-of-record status.
Standard pathwaySettlement Area projects, and Countryside projects beyond 120 m of features and outside a Category 1 LCA.
Planning (RPP) budgetMinor $3,500–$8,500 (addition/ARU beyond 120 m); standard $8,000–$18,000 (custom home, agricultural, or minor work within 120 m); complex $15,000–$45,000 (severance, commercial site plan, MVPZ relief).
Natural Heritage EvaluationTriggered within 120 m of a feature, or for new builds in Core/Linkage: $15,000–$40,000.
Hydrogeology / water balanceTriggered for custom homes, severances, commercial site plans, or any work within 120 m: $8,000–$15,000 single-lot scoped; $20,000–$35,000 for severance or commercial files.
Landform conservation plan & OLS surveyTriggered in a Category 1 ($12,000–$22,000) or Category 2 ($8,000–$15,000) LCA.
Arborist reportTriggered within 120 m of a feature or in Core/Linkage: $2,500–$7,500.
Grading, drainage & LID stormwaterTriggered for custom homes, commercial site plans or any LCA: $5,000–$18,000.
CA permit fee tierMinor for additions and ARUs beyond 120 m and outside a Category 1 LCA (standard when nearer a feature or in Category 1); standard for custom homes, agricultural buildings and severances; major for commercial site plans. Inside the 30 m MVPZ every project moves one tier up, and a custom home within 120 m of a feature in a Category 1 LCA is treated as major. The fee is read from the selected authority's published schedule; where the authority confirms fees only at pre-consultation, it is shown as such and left out of the total.
Timeline3–5 months minor; 6–10 months standard (custom home with scoped studies, or any NHE); 12–18+ months complex (severance, commercial, MVPZ relief, or multi-season NHE fieldwork in Core/Linkage).

How the landform calculator works

The Section 30 Landform Calculator converts every entry to square metres (1 sq. ft. = 0.09290304 m²; 1 acre = 4,046.8564 m²) and computes:

  • Total impervious = dwelling footprint + accessory buildings + paved driveway and parking + pool deck, patios and walkways.
  • Total disturbed = total impervious + septic bed and mantle + grading, cut/fill and cleared lawn.
  • Impervious % = total impervious ÷ total site area × 100; disturbed % = total disturbed ÷ total site area × 100.
  • Limits: Category 1 — 25% disturbed, 15% impervious; Category 2 — 50% disturbed, 20% impervious.
  • Remaining allowance (or required reduction) = limit × site area − proposed area, shown in m² and sq. ft. The calculator also warns when total disturbance exceeds the net developable area you enter.

Assumptions and limits

  • Results are preliminary scoping estimates. They are not a stamped RPP, P.Geo. or engineering opinion, not legal advice, and not a municipal or Conservation Authority decision.
  • Designation, feature boundaries and LCA mapping must be confirmed on the municipal Official Plan schedules and, ultimately, by field study.
  • Budgets exclude HST, municipal planning application fees, building permit fees, development charges, securities and peer-review deposits unless stated.
  • Timelines assume complete submissions; seasonal survey windows, resubmissions and appeals extend them.

Update policy

Figures are current as of the 2025/2026 published schedules. We review a source whenever a Conservation Authority or municipality publishes a new fee schedule or the province amends O. Reg. 140/02 or O. Reg. 41/24, and update the tables and tool logic together so they never disagree. If you see a figure that no longer matches an authority's published schedule, write to planning@themoraine.com.

Always confirm the current fee and submission requirements directly with the municipality and Conservation Authority before applying.

Before you buy, design or apply

Know what the Moraine will ask of your property

A pre-consultation site screening sets out the ORMCP designation, the Conservation Authority permit tier, the technical studies the municipality will require and a realistic soft-cost budget and timeline.