The kames, kettles, ridges and steep slopes left by the glaciers are what make the Moraine a moraine. Section 30 of O. Reg. 140/02 protects them with hard numerical limits on how much of a site can be disturbed or paved.

Rolling hummocky hills and hedgerows in morning mist

What Section 30 protects

Landform Conservation Areas are mapped by the Province where the Moraine's topography is most distinctive. Category 1 covers the most complex and sensitive terrain: steep slopes, kame hills, kettle depressions and ridges. Category 2 covers moderately complex landform. Outside these areas Section 30's numerical caps do not apply, although municipal grading by-laws still do.

The statutory limits

O. Reg. 140/02, Section 30 limits (per cent of total site area; disturbance kept within the net developable area)
CategoryMaximum disturbed areaMaximum impervious surfaceTypical terrain
Category 125%15%Steep slopes, kames, kettles, ridges
Category 250%20%Moderately rolling, hummocky terrain
Outside an LCANo s. 30 capNo s. 30 capMunicipal grading and site plan rules still apply

Disturbed area includes everything that changes the land surface: the house, garage and outbuildings, driveway and parking, patios and pool deck, the septic bed and mantle, and all graded, filled, re-sloped or cleared lawn areas. Impervious surface is the subset that sheds water: roofs, asphalt or concrete driveways, patios, walkways and pool decks. Every impervious square metre therefore counts twice — toward both caps.

Driveways decide most files. A 200 m rural driveway, 5 m wide, is 1,000 m² of impervious surface. On a 2 ha (20,000 m²) Category 1 lot that alone is 5% of the 15% impervious cap, before the house, garage or patio. Set the house closer to the road, narrow the driveway or switch to permeable pavers.

A worked example

2.0 ha Category 1 lot (20,000 m²), no excluded features
ElementArea (m²)Counts toward
House footprint450Impervious + disturbed
Detached garage120Impervious + disturbed
Asphalt driveway (160 m × 5 m)800Impervious + disturbed
Patio, walkways and pool deck230Impervious + disturbed
Septic bed and mantle600Disturbed
Grading and cleared lawn envelope2,300Disturbed
Total impervious1,600 (8.0%)Cap 15% = 3,000 m² → passes
Total disturbed4,500 (22.5%)Cap 25% = 5,000 m² → passes, 500 m² left

Run your own numbers, in square metres, square feet or acres, with the Section 30 Landform Calculator. It reports the remaining allowance or the reduction needed for each cap.

Surveyor with a total station on a graded building site
An Ontario Land Surveyor's topographic survey is the base for every landform conservation plan.

What a landform conservation plan contains

  1. OLS topographic survey with contours (commonly at 0.5 m intervals), slopes, existing structures, trees and feature limits.
  2. Net developable area calculation, excluding key natural heritage and hydrologic features and their minimum vegetation protection zones.
  3. Disturbance and impervious calculations against the Category 1 or 2 caps, with a site plan showing every disturbed area.
  4. Grading design that follows natural contours, limits cut and fill and avoids flattening kames or filling kettles.
  5. Stormwater and infiltration measures (low impact development) coordinated with the water balance.
  6. Restoration of temporarily disturbed areas with native vegetation.

Design strategies that keep a plan under the caps

  • Shorten and narrow the driveway: place the house nearer the road; a 4 m driveway with passing bays instead of 6 m throughout.
  • Permeable interlocking pavers and infiltration trenches: where the municipality accepts them as reducing effective impervious area.
  • Tighten the grading limit: walk-out designs that work with the slope instead of a flat pad; retaining walls only where they save disturbance.
  • Relocate or compact the septic mantle: a tertiary system can reduce bed size in some cases.
  • Combine accessory uses: an attached rather than detached garage; a smaller pool deck.
  • Keep lawn to a defined envelope and let the rest of the lot remain in meadow or woodland.

How the net developable area works

Section 30 caps are expressed as a per cent of the total site area, but all disturbance has to fall within the net developable area, which leaves out key natural heritage features, key hydrologic features and their minimum vegetation protection zones. A 4 ha lot with a 1 ha woodland and its 30 m buffer may have a much smaller envelope than its deed suggests. Municipalities differ in how they present the calculation, so the plan should show total site area, excluded areas and net developable area side by side, and flag any proposed disturbance that would fall outside the net developable area altogether. The Landform Calculator accepts an optional net developable area for exactly this check.

Typical cost

Indicative budgets (CAD)
ItemTypical range
Landform conservation plan and OLS topographic survey — Category 2$8,000 – $15,000
Landform conservation plan and OLS topographic survey — Category 1$12,000 – $22,000
Grading, drainage and LID stormwater engineering$5,000 – $18,000

Landform review sits alongside the NHE and the Section 6/7 pathway; the Screening Tool brings all three into one estimate. Fee tiers for the Conservation Authority permit are on the 2026 fee schedule, and the policy background is in the ORMCP policy guide.

Request Site Screening

Sources: O. Reg. 140/02, s. 30 (Landform Conservation Areas) and Part III; provincial Landform Conservation Area mapping. The worked example is illustrative. Limits are applied by the municipality at site plan review and confirmed at pre-consultation. See methodology.

Before you buy, design or apply

Know what the Moraine will ask of your property

A pre-consultation site screening sets out the ORMCP designation, the Conservation Authority permit tier, the technical studies the municipality will require and a realistic soft-cost budget and timeline.