Tool 1 · O. Reg. 140/02 · O. Reg. 41/24
ORMCP Permit, Study & Budget Estimator
Describe the property and the proposed works. The estimator applies the Oak Ridges Moraine Conservation Plan tests and the 2025/2026 Conservation Authority fee schedules to show the likely approval pathway, the studies a municipality will ask for, the permit tier, a soft-cost range and a timeline.
The Moraine · themoraine.com
Oak Ridges Moraine Pre-Consultation Scoping Brief
Choose the project details to see the scoping brief.
Preliminary scoping estimate based on O. Reg. 140/02, O. Reg. 41/24 and published 2025/2026 fee schedules — not an RPP or P.Geo. opinion or an approval. How it is calculated.
How the pathway is decided
Prohibitions come first: new lots in Natural Core and Linkage Areas, secondary suites there, severances outside the narrow Section 32 exceptions, and any development inside the 30 m minimum vegetation protection zone. Then the Section 6 and Section 7 existing-use and lot-of-record rights, then the standard municipal and Conservation Authority route.
Why studies are triggered
Works within 120 m of a key natural heritage or hydrologic feature need a Natural Heritage and/or Hydrological Evaluation (ss. 23 and 26). Landform Conservation Areas need a landform plan and topographic survey (s. 30). New dwellings and severances need a water balance (ss. 24–26).
What the figures include
Soft-cost ranges cover planning (RPP), ecology, hydrogeology, landform/grading and arborist work at Southern Ontario market rates, plus the Conservation Authority permit fee. Municipal application fees, building permits, development charges and construction are not included.
Before you buy, design or apply
Know what the Moraine will ask of your property
A pre-consultation site screening sets out the ORMCP designation, the Conservation Authority permit tier, the technical studies the municipality will require and a realistic soft-cost budget and timeline.