The MorainePlanning & Conservation Advisory

Practice Area · Lot Creation

Lot severances & Section 32 consent rules

Splitting a rural Moraine property is one of the hardest approvals in Ontario. Section 32 of O. Reg. 140/02 closes the door on market-driven residential lots outside Settlement Areas and leaves only a few narrow exceptions. Knowing which one applies, before you spend on studies, is the whole game.

Round hay bales in a cut field below a treeline

The starting point: no new residential lots outside Settlement Areas

The ORMCP treats lot creation as the most permanent change a landowner can make. Outside Settlement Areas, general residential severances are prohibited. That applies with full force in Natural Core Areas (about 38% of the Moraine) and Natural Linkage Areas (about 24%), and in practice in most of the Countryside Areas (about 30%) as well. In the roughly 8% of the Moraine designated as Settlement Area, lot creation is governed mainly by the municipal Official Plan, although Part III environmental and landform rules still apply on edge and hazard parcels.

Common misreading. A large acreage is not, on its own, a reason a severance will be granted. Parcel size does not override Section 32. Buyers paying a premium for "severance potential" on a rural Moraine parcel should get a feasibility opinion first.

The narrow Section 32 exceptions

Section 32 permits lot creation only for specific purposes, each still subject to Part III (natural heritage, water and landform) clearances:

Section 32 exceptions and what they require
ExceptionWhat it allowsKey tests
Surplus farm dwellingSeverance of a dwelling made surplus by the consolidation of farm operationsBona fide farm consolidation; the retained farmland is usually rezoned to prohibit a new dwelling; local Official Plan conformity
Minor lot boundary adjustmentMoving a lot line where no new lot is createdNo new lot; no adverse effect on features; frequently used to fix encroachments or fence-line errors
Infrastructure and utilitiesLots for permitted infrastructureInfrastructure tests in the Plan; public-interest purpose
Conservation acquisitionLots conveyed to a public body or land trust for conservationAcquisition by a conservation body; the conveyed land is protected
Settlement Area lotsLot creation consistent with the municipal Official PlanServicing, Part III features and landform; Official Plan policies

Agricultural and equestrian operations should also review the custom homes and Section 6/7 guide: in many cases the right answer is not a severance at all, but an expansion or an accessory structure under existing-use rules.

The Committee of Adjustment process

Consents are decided by the municipal Committee of Adjustment or, in some municipalities, the regional or land division committee. On the Moraine a well-prepared application usually follows these steps:

  1. Feasibility check. Designation, lot history, which Section 32 exception applies, distance to key features, landform category.
  2. Pre-consultation. Municipal planning, the Region and the Conservation Authority issue a checklist of required studies.
  3. Studies. Planning justification report, Natural Heritage Evaluation where within 120 m of a feature, hydrogeological assessment for servicing (well and septic) on the severed and retained lots, landform analysis in a Category 1 or 2 area, and a survey and draft reference plan by an Ontario Land Surveyor.
  4. Application and hearing. Public notice, agency comments and a hearing. Decisions can be appealed to the Ontario Land Tribunal (OLT).
  5. Conditions. Typical conditions include rezoning of the retained farm parcel, a CA clearance letter, a reference plan, parkland or cash-in-lieu, and servicing confirmations; all must be cleared before the certificate of official is issued.
Aerial view of farm fields, hedgerows and a rural homestead
Farm consolidation can make an existing dwelling surplus, one of the few routes to a new lot under Section 32.

Budget and timeline

Indicative soft costs for a Moraine consent file (CAD)
ItemTypical range
Planning consultant (RPP): feasibility, planning justification, hearing$15,000 – $45,000
Natural Heritage Evaluation (if within 120 m of a feature)$15,000 – $40,000
Hydrogeological assessment for two lots (wells, septic, water balance)$20,000 – $35,000+
OLS survey and reference planQuoted per parcel
Municipal consent application fees$325 – $15,000+ depending on municipality
Conservation Authority review / clearanceSee 2026 CA fees

Severance files with multi-season ecological work and a Committee hearing commonly take 12 to 18 months or more. Appeals add time.

Spend the least money first. A planning feasibility opinion costs a fraction of the technical studies. If the parcel does not fit a Section 32 exception, no amount of ecology or hydrogeology will make the application succeed.

Lot creation by designation at a glance

Can a new lot be created?
DesignationResidential severanceNarrow exceptions
Natural Core AreaGenerally prohibitedMinor lot adjustment or conservation acquisition only
Natural Linkage AreaGenerally prohibitedMinor lot adjustment, conservation, limited infrastructure
Countryside AreaStrictly limitedSurplus farm dwelling, boundary adjustment, conforming to the local Official Plan
Settlement AreaPer Official PlanSubject to Part III features, servicing and landform

Questions to answer before you list or buy on severance potential

  • Was the parcel a single lot of record on November 15, 2001, or already two or more lots that may have merged on title?
  • Is the land actively farmed, and is there a genuine farm consolidation that would make a dwelling surplus?
  • Would the proposed lot line cross or sit within 120 m of a wetland, stream, woodland or seepage area?
  • Is any part of the land in a Category 1 or Category 2 Landform Conservation Area, which would limit the building envelope on the new lot?
  • Can both the severed and retained lots support a well and septic system meeting provincial and municipal standards?

If the honest answer to the first two questions is no, the conversation usually moves from a new lot to a boundary adjustment, an addition or an accessory building under the existing-use rules.

Compare all four designations in detail in the ORMCP policy guide, or run your scenario through the Screening Tool with "Lot Severance" selected.

Request a feasibility screening

Sources: O. Reg. 140/02, Part II land-use designations and s. 32; Planning Act consent provisions; O. Reg. 41/24. Figures are planning ranges, not quotes; requirements are confirmed at municipal and CA pre-consultation. See methodology.

Before you buy, design or apply

Know what the Moraine will ask of your property

A pre-consultation site screening sets out the ORMCP designation, the Conservation Authority permit tier, the technical studies the municipality will require and a realistic soft-cost budget and timeline.